US 14 is an important route in and around the Madison metropolitan area. Between WIS 92 and County MM, the existing US 14 does not have the capacity or design to carry the rising traffic volumes in the area.

To address this issue, the Wisconsin Department of Transportation (WisDOT) is undertaking two reconstruction projects on this section of US 14 and one reconstruction project at the US 14/WIS 138 interchange:

  • In 2009, WisDOT plans to expand the existing US 14 to four lanes from County MM to WIS 138.

  • In 2011, WisDOT plans to reconstruct US 14/WIS 138 interchange and placement of roundabouts at the ramp terminals.

  • In 2015, US 14 will be reconstructed as a new two-lane, limited-access highway between WIS 138 and WIS 92. This section of roadway will be relocated onto right of way originally purchased in 1976.

In 2012, to address existing pavement degradation of US 14, WisDOT plans to resurface US 14 between US 12/18 and County MM.


US 14 between WIS 138 and WIS 92

US 14 will be reconstructed between WIS 138 and WIS 92 as a limited access highway on a new location.


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index