US 14/WIS 11 corridor study - public involvement

Meetings | Committees | Workshop | Newsletters/handouts/other

Corridor studies are a cooperative effort among the public, state and federal review agencies, and WisDOT. Extensive effort is always made to keep the public involved and informed throughout the study process.

Public information meetings (PIM)

Scheduled/future

  • There are no meetings scheduled at this time.

Past meetings

  • June 28, 2005 - PIM was held in Janesville to discuss the expanded study area, which includes a potential connection between US 14 and the existing WIS 11 bypass on the west side of Janesville.
  • November 11 and 13, 2003 - PIMs were held in Janesville and Darien. Input received at the meetings will help in the development of improvement alternatives.

Top Return to top

Committees

Two committees have been formed to provide additional information and guidance to the study team.

Alternatives Workshops

Alternatives workshops were held with the technical and advisory committees for both the east and west segments of the study area. Participants developed a full range of potential improvement alternatives.

SAFETEA-LU

Section 6002 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU 6002) requires the lead agency for a project to establish a plan for coordinating public and agency participation during the environmental review process. SAFETEA-LU was implemented in 2005 for all Environmental Impact Statements (EIS) with a Notice of Intent published after August 10, 2005. The Notice of Intent for the US 14/WIS 11 Corridor Study was published after that date, therefore, a coordination plan was developed in accordance with SAFETEA-LU 6002.

Needs Assessment workshop

October 2, 2003 - A local officials Needs Assessment workshop was held. Participants formed groups to identify key issues associated with the US 14/WIS 11 corridor.

The following documents are in Adobe PDF PDF format.
(Note: some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Newsletters/handouts/other

The following documents are in Adobe PDF PDF format.
(Note: some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Top Return to top


Photo of Needs Assessment workshop participants.


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index