I-94 North-South corridor study - public involvement, meetings

Public information meetings and hearings | Contractor workshops | Community workshops | Overview presentationAdvisory committees | Stakeholder meetings | Ways to comment

 

Public information meetings (PIM) and hearings

WisDOT held a series of public workshops and public information meetings in Milwaukee, Racine and Kenosha counties to present concepts and ideas on possible improvements to the I-94 North-South corridor, extending from the Mitchell Interchange area in Milwaukee to the Illinois state line.

Public hearings were held in Sturtevant, Kenosha, Oak Creek and Milwaukee in mid December.

The following documents are in Adobe PDF PDF format.
(Note: some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see some details.)

December 2007 - Materials from public hearing

Top Return to top

May 2007 - Materials from PIMs

Impact Assessment Methodologies

Southeast freeway public information meeting May 2007 (1.1 MB)

Racine and Kenosha County

Milwaukee County

Top Return to top

November/December 2006 - Materials from PIMs

Kenosha and Racine interchange exhibits

Top Return to top

June 2006 - Materials from PIMs

Top Return to top

Contractor workshops

October 1, 2008

Community workshops

Four brainstorming workshops were held to gather the public's input for possible improvements.

A total of 540 people attended a series of four community workshops on the I-94 North-South corridor study earlier this year. The workshops allowed the public to interact with the study team and share ideas and concerns about the freeway corridor, as well as explore possible solutions. Citizens were encouraged to ask questions, mark their thoughts on freeway maps, exchange information, offer suggestions and present known problems relating to the corridor.

From these workshops, WisDOT assembled the ideas and comments and will refine them into concepts to be presented at the upcoming public information meetings.

Materials from the workshops

Summary of comments from the workshops

Corridor study overview presentation

Top Return to top

Advisory committees

There are three advisory committees formed as another vehicle for input and outreach.

Stakeholder group presentations

The I-94 North-South corridor study team will meet with constituent groups at any time. Add your group's name to the list of individuals and groups who have met face-to-face with study staff.

Ways to comment

The I-94 public comment period was extended to January 25, 2008.

At the hearings there will be court reporters to record oral testimony. Pre-addressed comment forms are also available at the hearing locations. If you are unable to attend, please submit comments by:

  • Calling the project hotline: (262) 548-8721
  • E-mail us at dotsefreeways94nsc@dot.state.wi.us
  • Fax your letters in to (262) 548-5662
  • Send to
    WisDOT: Attention Bob Gutierrez
    P.O. Box 798
    Waukesha, WI 53187-0798

back Back to public involvement

Top Return to top

People participating in a WisDOT community workshop.


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index