skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

WIS 26 to Thill Road project

WIS 26 to Thill Road project 

This project was completed.  For more information, contact:

Wisconsin Department of Transportation Northeast Region
944 Vanderperren Way
P.O. Box 28080
Green Bay, WI 54304-0080
Phone: (920) 492-5643
Fax: (920) 492-5640
TTY: (920) 492-5673
E-mail: greenbay.dtd@dot.state.wi.us

Kim Rudat, WisDOT Northeast Regional Communications Manager
Phone: (920) 492-5743
E-mail: kim.rudat@dot.state.wi.us

Improvements to 5.2 miles of US 151 from WIS 26 to just south of Thill Road in western Fond du Lac County were completed in late 2004.

Improvements included:

  • Additional roadway capacity to serve existing and forecasted traffic volumes.
  • Improved operational efficiency and safety for through and local traffic.
  • A system link to US 41 and the Fond du Lac bypass east of US 41.

Residents and travelers along US 151 will benefit from reduced travel times, increased access to local, regional and statewide resources, and economic development.


 

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index