skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

SE WI freeway system

Zoo Interchange

Conceptual timeline

Traffic

Maps

Public involvement

Contacts

Zoo Interchange - conceptual timeline

The following is a conceptual timeline for a study, design and construction process for the Zoo Interchange.

Date Type of work/activity
2007-2009 Conduct environmental and engineering analysis.
2007-2010 Public involvement (workshops, public information meetings, public hearings, Technical Advisory Committee (TAC) meetings, Community Advisory Committee (CAC) meetings).
June 2008 Corridor study, initial alternatives finalized.
October 2008 Corridor study, final alternatives developed.
2009 Draft Environmental Document completed.
Late-April 2009 Corridor study completed and preferred alternative selected.
2009-2010 Preliminary engineering.
2010-2012 Conduct final design and begin to address real estate and utility issues.
2012-2016 Reconstruct the interchange.

Zoo Interchange schedule PDF

All work and timelines on the Zoo Interchange are dependent on state and federal funding and on all appropriate state and federal review and approval processes. 

Link to more on this topic More information on highway planning and environmental review processes and regulations...

Top Back to the public involvement

Top Return to top


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index