US 10 Expansion Project - Completed projects

Project: Casimir Road interchange
Dates: June 2006 to November 2006
Description: Ramps were added to the existing Casimir Road overpass for local access to I-39. Local access is available at the Portage County X interchange.

Project: US 10 Wisconsin River Crossing, County E to Pinewood Drive
Dates: September 2006 through September 2008
Description: A new bridge across the Wisconsin River, north of Stevens Point.

Project: I-39/US 10 west interchange
Dates: August 2007 through August 2009
Description: A new interchange was constructed north of the Portage County X overpass to provide free-flow traffic access from I-39 to the new US 10 west bypass.

Project: US 10, Long Road to River Road
Dates: September 2007 to August 2009
Description: Construction of a new four-lane freeway from Long Road to River Road. The project also included a Portage County E overpass and a new interchange with WIS 34 north.

back Back to Schedule


Related information

WisDOT roundabout information

'In This Together' program - Information for businesses located in work zones

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey