skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 12 Freeway Conversion Study

Need/purpose

Schedule

FAQ

Maps

Environmental documents

Public involvement

Project photos

Contacts

US 12 Freeway Conversion Study

Overview

This 6.1 mile corridor, from the Parmenter Street interchange just north of Middleton to WIS 19 west in the Town of Springfield, of US 12 is part of Wisconsin’s National Highway System (NHS).

This corridor provides a parallel route from the Madison metro area to I-39/90/94 and to the major tourism destination area in the state and region and to Wisconsin Dells.

This study will help increase highway functionality and safety along corridor.

The existing expressway was finished in 2005. Dane County’s North Mendota Parkway Study intends to tie into US 12 for the western termini.

Benchmarks

  • 2008 - Start of planning.
  • 2008 to 2010 - Data gathering/preliminary alternative development.
  • 2010 to 2011 - Environmental documentation.
  • 2011 - Official SS 84.295 mapping.


Aerial image of US 12 Freeway Conversion Study location.

Aerial image of US 12 Freeway Conversion Study location.

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index