skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 151 Freeway Conversion Study

Need/purpose

Schedule

Maps

Environmental documents

Public involvement

Contacts

US 151 Freeway Conversion Study

US 151 is designated as a Corridors 2020 backbone route, which is an important roadway connecting the south central part of the state with the Fox Valley and Green Bay area.

This study will analyze the US 151 corridor for conversion to a freeway facility. This will entail looking at the removal of driveways that access the roadway, at-grade intersections and railroad crossings.

Removing at-grade intersection and access points will improve roadway safety and the Level of Service. The study will help preserve the corridor for highway purposes.

The study location is US 151 from WIS 73 (Columbus) to WIS 49 (Waupun) in Dodge County and is approximately 27 miles long.  The planning began in July 2007.


Aerial view of the US 151/County D interchange south of Beaver Dam.

 

 

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index