skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 53 Corridor Preservation Study

Haugen Area

Haugen Area Schedule

Haugen Area Maps

Haugen Area Environmental documents

Haugen Area Public involvement

Haugen Area Contacts

US 53 Corridor Preservation Study - Haugen Area (26th Avenue to 30th Avenue)

July 1 - Public hearing scheduled at 7 p.m. at the Haugen Elementary School, 615 5th Street in Haugen.

The Wisconsin Department of Transportation (WisDOT) is conducting a Corridor Preservation study due to increased traffic and development along US 53. The increased capacity is creating operational and safety issues along the corridor.

Most of the problem areas are located at higher volume at-grade (i.e. stop sign) intersections, such as intersection at Haugen.

A completed Corridor Preservation study will also provide a blue print by which local development can be planned and implemented in harmony with the operational demands of the highway. 

Since it may be decades before all the necessary construction funding is obtained, it is critical the plan be developed now to ensure the next phase of improvements for a freeway/expressway can actually occur in the future.


US 53 Corridor Preservation Study - Haugen Area.

 

Other US 53 segments:

Haugen Area

Spooner/Trego Area

Minong Area

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index