skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

WIS 100 (Brown Deer Road)

Need/purpose

Schedule

Maps

Public involvement

Traffic impact

Contacts

WIS 100 (Brown Deer Road) - traffic impacts

It is anticipated that during highway construction, two-way traffic will be moved to one side of the median with the other side closed for construction. This will provide one lane of traffic in each direction with the middle lane for left turns. With one side completely closed, the construction will be able to proceed at a faster pace.

Driveways will remain open during construction, except during brief periods with advance notification.

Some night or weekend work may need to occur during the project.

All closures are dependent on favorable weather conditions. Please drive with caution through the work zone.

Work zone safety tips

  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient


 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index