skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

WIS 26 corridor

Map

Bike route study

Corridor plan

Environmental Impact Statement

Expansion project

Contacts

WIS 26 corridor expansion project - Segment 8, Watertown to WIS 60 East

Segment 8 consists of reconstructing 6.5 miles of the existing highway between County Q and WIS 60 East, north of the city of Watertown.

The highway will be expanded to two lanes in each direction with a grass median. South of the city of Watertown, at-grade side road and driveway intersections will remain, although driveways will be combined to a single access point or moved to a side road where possible. Median crossing points will be widely spaced to improve safety, so some intersections and driveways will be limited to right in/right out movements. Right turn lanes will be added at all side road intersections and left turn lanes will be added at each median crossing.

The east leg of WIS 60 will be rebuilt on new alignment, beginning about 3/4 of a mile east of the current intersection with WIS 26. It will connect directly with the west leg of WIS 60 at the interchange with WIS 16 and WIS 60 West. The interchange will be rebuilt as a standard diamond and accommodate traffic in all directions.

Schedule

Real estate acquisition is scheduled to begin in 2010.

Construction of segment 8 is scheduled to begin in 2013 and extend through 2015. The estimated construction cost is at $29 million in 2008 dollars.

Top  Return to top

Maps

Project overview

Map of WIS 26 corridor expansion segment 8.

Back Back to WIS 26 expansion project

Top  Return to top

WIS 26 expansion segments:

Segment 1 - Janesville to Milton

Segment 2 - WIS 59 relocation at Milton

Segment 3 - Milton to Fort Atkinson

Segment 4 - Fort Atkinson bypass

Segment 5 - Jefferson bypass

Segment 6 - Jefferson to Johnson Creek

Segment 7 - Johnson Creek to Watertown

Segment 8 - Watertown to WIS 60 East

 

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index