WIS 45-100 Corridor Study - Schedule

Date Type of work/activity
April 2007 Began study (information gathering).
July 2007 Existing operations analysis.
October 2007 Development of preliminary alternatives.
Nov. 14, 2007 Public informational meeting (PIM) was conducted.
Winter 2008 Refine alternatives based on public input.
April 17, 2008 PIM was conducted
June 2008 Value engineering study.
Nov. 12, 2008 PIM was conducted.
Fall 2009 Selection of preferred alternative.
Sept. 30, 2009 PIM was conducted.
Fall 2010 Public hearing to be conducted (if requested).
Winter 2010 Finalize preliminary roadway plans.


 

 

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey